Background
ADA Air Conditioning & Heating, a leading HVAC company serving Jackson, TN, and surrounding areas, faced a challenging project in the summer of 2022. A large commercial building in downtown Jackson was experiencing frequent breakdowns of its aging air conditioning system, leading to discomfort for employees and customers alike.
The Challenge
The 50,000-square-foot office complex, housing multiple businesses, had an outdated HVAC system that was:
- Inefficient, resulting in high energy costs
- Prone to breakdowns, requiring frequent repairs
- Unable to maintain consistent temperatures throughout the building
- Nearing the end of its operational lifespan
The building owners needed a solution that would provide reliable cooling, improve energy efficiency, and minimize disruption to the businesses operating within the complex.
The Solution
After a thorough assessment, ADA Air Conditioning & Heating proposed a comprehensive HVAC installation plan:
- Replace the existing system with a state-of-the-art, energy-efficient commercial HVAC unit
- Install smart thermostats for better temperature control and energy management
- Implement a zoned cooling system to address varying needs across different areas of the building
- Upgrade ductwork to improve airflow and system efficiency
The team from ADA worked closely with the building management to develop a phased installation approach, minimizing disruption to the tenants’ daily operations.
Implementation
The installation process was carried out over three weeks, with most of the work done during evenings and weekends. ADA’s experienced technicians:
- Removed the old system and installed the new HVAC unit
- Retrofitted existing ductwork and added new sections where necessary
- Installed smart thermostats and programmed them for optimal performance
- Conducted thorough testing and balancing of the new system
Throughout the process, ADA maintained open communication with the building management and tenants, providing regular updates and addressing any concerns promptly.
Results
The new HVAC system installed by ADA Air Conditioning & Heating delivered impressive results:
- Energy consumption reduced by 30% in the first month of operation
- Consistent temperatures maintained throughout the building
- Improved air quality and comfort reported by tenants
- Zero breakdowns or service calls in the six months following installation
The building owners were particularly pleased with the professionalism and efficiency demonstrated by the ADA team throughout the project.
Conclusion
This case study highlights ADA Air Conditioning & Heating’s expertise in handling complex HVAC installations for large commercial properties. By combining technical know-how with excellent customer service, ADA successfully transformed the comfort and energy efficiency of a major Jackson, TN, office complex. This project serves as a testament to the company’s commitment to delivering top-quality air conditioning and heating solutions across Jackson, Spring Creek, Humboldt, Medina, Huntersville, and Three Way, TN.